All Lined Up.

Tide Guy came home yesterday around 1:00. And......we got all the rails up on the deck. We got the last one done around 6:00 and it was very cold and dark. We had to finish with a flashlight, but they are all done. It was so dark, Tide Guy couldn't even get the caps snapped onto the top. That will take a minute today. I also cleaned out the flower pots and some debris underneath the deck. We have to clear this out so the concrete can be poured there. It looks a lot better but there are a lot of leaves that will have to be blown out.

Tide Guy now plans to clean the deck and railings. We also need to take some boards and junk to the burn pit here. I've sent a message to the landscape guy that we need to touch base for planning purposes.

The culvert for the temporary drive arrived Thursday. We need to get dirt so that can be installed for the large trucks to cross into our lot.

The tree service is scheduled to come in about two weeks if the weather holds out. They will cut down 15 trees of various sizes, cut into smaller pieces, and haul off.

The pool guy is scheduled to begin digging the end of March when I return from Disney.

The Niece is very excited about the pool and has offered to help us dig. She is a hoot.